References

locality
investor
term 2022 - 2024

locality
investor
term 4.2022 - 12.2023

Vstupní objekt Národního technického muzea

locality Čelákovice
investor Národní technické muzeum
term 2022 - 2023

Vstupní objekt Národního technického muzea

locality
investor
term 2020 - 2023

HZ Opatovice nad Labem

locality Opatovice nad Labem
investor Municipality of Opatovice nad Labem
term 4.2021 - 12.2021

Our company successfully completed the construction of a fire station for the volunteer fire brigade (VFB) in the municipality of Opatovice nad Labem.

The VFB fire station building will be used for a local unit of category III/1. In the fire station building, 3 garage spaces were created, one of which will also serve as a workshop. A locker room for 20 people, an emergency toilet, a storage room for contaminated clothes and a cleaning room were also built. Of course, there is also a tower for drying hoses, which will allow the future installation of a climbing training wall. In addition, the garage has an accessible steel mezzanine with sanitary facilities, training room, office, storeroom, cleaning room and access to the tower mezzanine.

HZ Opatovice nad Labem

Residential house – Rezidence Stříbrná zahrada

locality Újezd u Průhonic
investor Rezidence Stříbrná zahrada s.r.o.
term 3.2020 - 5.2022

New construction of a three-storey apartment block of monolithic construction, in which 28 housing units of 1-room with kitchenette (1kk), 2-room with kitchenette (2kk) and 3-room with kitchenette (3kk) layout were created.

Residential house – Rezidence Stříbrná zahrada

NPK, a.s., Pardubice Hospital – refurbishment of catering facilities

locality Pardubice
investor Pardubice region
term 7.2021 - 6.2023

The refurbishment was carried out while the building was in operation and was divided into 3 successive stages. The main structural modifications were carried out on the ground floor and 1st floor levels with an overlap to the roof and the 1st underground level. A new cooking room including the necessary facilities was built on the ground floor. In the 1st floor a tray set system, a cold cuisine and a comfortable canteen for employees were set up.

NPK, a.s., Pardubice Hospital – refurbishment of catering facilities

House of affordable housing (Dům dostupného bydlení)

locality Havlíčkův Brod
investor Municipality of Havlíčkův Brod
term 5.2011 - 5.2022

Our company has successfully completed the construction of an affordable housing building in Havlíčkův Brod. In the course of one year, a new three-storey building with 14 housing units and an adjoining one-storey commercial space will be built.  Construction was completed in less than 12 months.

House of affordable housing (Dům dostupného bydlení)

Drahelčice kindergarten

locality Drahelčice
investor Municipality of Drahelčice
term 6.2020 - 5.2021

New construction of a kindergarten with a capacity of 72 children including delivery and installation of catering technology, implementation of all connections, roads and parking spaces, outdoor play elements, etc. The investor of the project was the municipality of Drahelčice.

More information on the virtual tour of the completed building – https://www.youtube.com/watch?v=O6qsFLdag00

Drahelčice kindergarten

Konečná kindergarten

locality Havlíčkův Brod
investor Town of Havlíčkův Brod
term 12.2019 - 12.2020

Newly built kindergarten on the premises of Konečná Primary School in Havlíčkův Brod. It is a two-storey building, which includes 3 new departments as well as a kitchen and canteen. The new kindergarten will accommodate 64 children. All connections, paved areas and playgrounds, including all play elements, were also part of the scope of our project. The project was ordered by the town of Havlíčkův Brod.

Konečná kindergarten

K A M A headquarters

locality Prague
investor K A M A spol. s r.o.
term 4.2019 - 5.2020

Our company successfully completed the reconstruction and superstructure of the headquarters building for the K A M A spol. s r.o. company in Prague.

The work was divided into two phases. Within the scope of the first phase, which was completed regardless of the Client’s full operations at the time, the superstructure of the 2nd -floor production and administrative parts of the building was completed. The building was completed insulated and a wooden façade was added to the administrative space. Operations were then partially transferred to the newly built floor and, as part of the second phase of the work, the existing areas on the 1st floor, including the company store, were reconstructed at the same time. 

K A M A headquarters

PET/CT workplace, Pardubice Regional Hospital

locality Pardubice
investor
term 3.2020 - 9.2020

Our company successfully completed the construction of a new building as part of the PET/CT workplace of the Pardubice Regional Hospital. As an addition to the workplace, new areas were built, including a waiting room, a patient prep area, employee day-rooms, a CT examination room, storage areas, a physician’s workroom, an office, and social facilities. The following rooms were also completed for the functionality of the local departments: radiopharmaceutical reception, material filter, drug preparation, application room, drug control, and personnel filter.

This project took 6 months to complete.

PET/CT workplace, Pardubice Regional Hospital

KODYS, spol. s r.o. headquarters

locality Prague
investor KODYS, spol. s r.o.
term 4.2019 - 1.2020

Our company, RONELI Construction SE, completed work on the “New Headquarters for the KODYS, spol. s r.o. Company”.  

The company’s original administrative building could be found on a plot situated in Prague 5, next to Motol Castle. This building was completely demolished and a new, modern three-storey headquarters for the KODYS company was built in its place.

Apart from the demolition of the previous building and the construction of its replacement, part of our commission also included securing network hook-ups as well as the construction of access roads, 25 parking spots, and asphalt paving. 

KODYS, spol. s r.o. headquarters

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

locality Prostějov
investor Očenášek - Mikulka, spol. s r.o.
term 9.2019 - 3.2020

Our company successfully completed work on the commission “Energy Savings at the Očenášek - Mikulka, spol. s r.o. Compound”. Over six months, the construction of three production halls in the industrial park located on the edge of Prostějov was completed. Part of this project included updating the perimeter and roof covering, including the auxiliary steel construction and roofing components, the thermal insulation structure, the exterior filler openings, and the installation of a new lightning rod. This project was unique in that the work was carried out regardless of the full operation of the Client and their tenants.

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

Completion of a hall for MONTS s.r.o.

locality Hradec Králové
investor MONTS s.r.o.
term 8.2018 - 11.2019

Our company completed the construction of a new industrial hall, including an administrative extension, for the company MONTS s.r.o. in Hradec Králové.
Apart from the hall and the administrative sections, part of the work completed by our company also included the construction of roads on the premises, asphalt paving, the relocation of tracks/network hook-ups, and the construction of an outdoor stationary crane and railway tracks.
The project was unique in that both the administrative area and the hall were designed according to the Passive House Standard.
Construction was completed in accordance with the contractual work schedule and it took 13 months to finish.

Completion of a hall for MONTS s.r.o.

Superstructure and reconstruction of the Nuselská Primary School in Havlíčkův Brod

locality Havlíčkův Brod
investor Město Havlíčkův Brod
term 8.2018 - 4.2019

The company RONELI SE successfully completed the construction-related commission, “Reconstruction of the Nuselská Primary School in Havlíčkův Brod”. This commission entailed the renovation of the 5th floor and the reconstruction of several existing classrooms on the 4th floor of the school.

Thus the school received a new digital planetarium, a natural sciences classroom, and a multifunctional classroom with a 2D projector. Part of the original floor plan of the roof was turned into an outdoor study area, part of which includes a greenhouse and space for watching the stars.

All the work was completed while school was in session, and in combination with the character of the commission, great emphasis was placed on, among other things, the safety not only of our employees but primarily the safety of the children and the employees of the school.

Superstructure and reconstruction of the Nuselská Primary School in Havlíčkův Brod

Central pavilion for the Primary School in Opatovice nad Labem

locality Opatovice nad Labem
investor Obec Opatovice nad Labem
term 6.2018 - 12.2019

Our company completed the construction of a new central pavilion for the Primary School in Opatovice nad Labem. The central pavilion connects the 4 existing school buildings, creating a single primary entrance onto the grounds. Central lockers were built for the students on the first floor, and four new basic classrooms and one language skills lab were built on the 2nd and 3rd floors. Thus, operationally speaking, the central pavilion became the traffic heart of the school. The fact that it includes barrier-free access goes without saying. This commission took 11 months to finish.

Central pavilion for the Primary School in Opatovice nad Labem

Hall for the SOU (Vocational School) building in Pilsen

locality Plzeň
investor SOU stavbní Plzeň
term 1.2018 - 12.2018

Our company completed the construction of a new hall for the vocational training centre in Pilsen. The hall serves as a practical learning area for the SOU students, and the commission for this project was made by the school. The hall and its steel construction were designed as a single object segmented into four learning spaces with utility and sanitary facilities. The entire building is lit by 48 skylights.

Hall for the SOU (Vocational School) building in Pilsen

Reconstruction of a catering facility and roof cladding of a production hall

locality Pilsen, CZ
investor DRIESSEN Czech s.r.o.
term 02.2018 – 06.2018

Our company has successfully completed the “Reconstruction of the catering facility and roof cladding” at DRISSEN Czech s.r.o. in Pilsen. The part of the contract entrusted to our company included a complete reconstruction of the interior of the catering facility, the delivery of the kitchen equipment and the reconstruction of 5000 m2 of the roof cladding of the production hall.

Reconstruction of a catering facility and roof cladding of a production hall

Construction of a development and testing centre

locality Klecany, CZ
investor Avaps s.r.o.
term 11.2017 – 03.2018

The building, designed as a single-storey steel structure clad in sandwich panels and with a saddle roof will be used for the development and testing of new products. Besides the furnace, the hall also features a two-storey block housing a control room, changing rooms with sanitary facilities, and a training room. About 1500 m2 of new paved areas have been built around the test centre. The project was completed in four months, with most of the work having been done in winter.

Construction of a development and testing centre
Previous page / Next page (1/3)
Modul: Výpis referencí z webů divizí